Friday, November 19, 2010

Sample Letter To Disable Telephone Line

at GKM, yesterday the blue hour

yesterday evening, shortly after sunset I was at the Rhine, the Palatinate page at the ferry dock in Altrincham.
Compared to Mannheim on the page is currently building block 9 of the large power plant in Mannheim, GKM
According to the Internet site of the operator , Unit 9 of the coal-fired power plant in 2013 with a capacity of 911 MW electricity and 500 MW district heating performance in service. Until then, 1.2 billion € will be installed. The old power plant parts, Block 3 and 4 will then be closed and replaced by the new block 9.
The gigantic chimney rises to a height of 180 m

The existing power plant in operation





at night will be delivered by water and coal deleted

below some pictures from the site





Sample Letter To Disable Telephone Line

at GKM, yesterday the blue hour

yesterday evening, shortly after sunset I was at the Rhine, the Palatinate page at the ferry dock in Altrincham.
Compared to Mannheim on the page is currently building block 9 of the large power plant in Mannheim, GKM
According to the Internet site of the operator , Unit 9 of the coal-fired power plant in 2013 with a capacity of 911 MW electricity and 500 MW district heating performance in service. Until then, 1.2 billion € will be installed. The old power plant parts, Block 3 and 4 will then be closed and replaced by the new block 9.
The gigantic chimney rises to a height of 180 m

The existing power plant in operation





at night will be delivered by water and coal deleted

below some pictures from the site