Friday, November 19, 2010

Sample Letter To Disable Telephone Line

at GKM, yesterday the blue hour

yesterday evening, shortly after sunset I was at the Rhine, the Palatinate page at the ferry dock in Altrincham.
Compared to Mannheim on the page is currently building block 9 of the large power plant in Mannheim, GKM
According to the Internet site of the operator , Unit 9 of the coal-fired power plant in 2013 with a capacity of 911 MW electricity and 500 MW district heating performance in service. Until then, 1.2 billion € will be installed. The old power plant parts, Block 3 and 4 will then be closed and replaced by the new block 9.
The gigantic chimney rises to a height of 180 m

The existing power plant in operation





at night will be delivered by water and coal deleted

below some pictures from the site





0 comments: